Shanghai Pudong International Container
Terminals Co., Ltd., established on March 1st, 2003, is jointly managed by
Shanghai Waigaoqiao Free Trade Zone Harbor Affairs Company, Hong Kong Heji Port
Pudong Co., Ltd., COSCO Pacific Ocean (China) Investment Co., Ltd. and Shanghai
Industry Real Capital Construction Holding Co., Ltd.
Shanghai Pudong International Container
Terminals Co., Ltd. is located in the A District of Wagaoqiao Free Trade Zone,
south bank of Yangtze River, which adjoins the Shanghai Outer Ring Road,
Yanggao Road in Pudong and Shanghai, Chongming and Jiangsu exceed river project
under construction. The Quay has a total length of 900 meters, 3 container
berths, which can be berthed the fifth and sixth generation container ship.
There is 500,000 square meters land-based area, with 8200 slots, which can be
piled up 30000 standard containers at the same time, the special-purpose
refrigerated container district, hazardous articles container district and
container dismantle and load warehouse are also equipped. In case, it is a
modernized container terminal with complete facility and multiple function.
Shanghai Pudong International Container
Terminals Co., Ltd., with superior equipment and high scientific and
technological content, has 147 all kind of mechanical equipments, including 10
container bridge cranes, 36 container tire cranes, 73 container trucks, 11
container forklifts, etc. Through scientific and technological development and
technological innovation, systems, such as CTMS real-time production、container
truck full-court regulate and control, load and unload、intelligentized yard ,
are used in the container production. Now, it becomes a higher technology
contained modernized container terminals in Shanghai Harbor, even among the
national container terminals.
Shanghai Pudong International Container
Terminals Co., Ltd. has 18 international main container routes at present, many
internationally famous shipping company, including APL, CMA CGM,NYK, P&O
NEDLLOYD, OOCL, have routes attached, 80 regular attached container ship per
month. The company can provides ship companies and clients individualized
high-quality service through safe, convenient, economic and reliable service
platform.
Waigaoqiao Harbor Zone first stage quay
is the first new harbor zone in Waigaoqiao zone after the State Council
announced the open of Pudong development. Since May 5th, 1994, the first
“Shanghai-South America” container regular ship route opened, finished
container amount top to 10million in June 2nd, 2004. In 1998, the container
terminal was transformed, since then, the production capacity of the container
has been increasing year by year, and reached 1,209,000 million standard
container in 2000, which is the first time surmounted 1million. Since 2000, the
production was increased progressively at speed of more 300,000 every year, and
added up to 6,520,000 in fours years. In 2003, it became a joint-venture and
has been injected new vigor by system and mechanism innovation, increasing of
production capacity construction and improving the scientific and technological
content of the container loading and unloading. Before it entered into
partnership, 2 million containers were finished in 1year and 8 days, however,
after that, it only cost 11months and 3 days, which means the production
capacity level has been improved a lot. Now, it becomes an important container
loading and unloading production quay in Shanghai Harbor.
|